Utility systems

Electrical Power Supply

  • two independent entrances to the facilities
  • own unit substation
  • engineering and IT equipment covered by UPS protection with full backup
  • all servers have a full power unit backup
  • total DPC power consumption – 350 kW

Cooling Supply

  • the cooling system has a fault-tolerant configuration N+1
  • 6 internal blocks, 2 pumps, 3 cooling towers

Information security support

  • Gaseous fire suppression system;
  • Access control system;
  • CCTV system;
  • The computing capacities are distributed between Data Processing Centers, located in the head office and offices in the south-west of Moscow.